30-day money-back guarantee on every paid tool and bundle — if it doesn't pull its weight, email support and we'll refund it.
Builds a kickoff-ready multi-volume annotated outline (AO) for a federal proposal from pasted Section L…
Builds a kickoff-ready multi-volume annotated outline (AO) for a federal proposal from pasted Section L instructions, win themes, and page allocations. Produces three deliverables: (1) a hierarchical annotated outline with verbatim Section L references, M-factor links, REQ ID traces, page budgets, writer assignments, theme/discriminator/graphic placeholders, and content guidance bullets; (2) a writing assignment matrix with owners, backups, color-team reviewers, and Pink/Red/Gold due dates; (3) a page budget allocation table with a PASS/FAIL reconciliation gate. Consumes the Compliance Matrix Builder matrix when provided so REQ IDs auto-flow. Use this skill when a proposal manager says "proposal outline generator", "build proposal outline", "annotated outline", "AO generator", "proposal outline from Section L", or "kickoff outline". Shipley Phase 6 conventions. No fabricated requirements, themes, or color-team dates.
Ships as one download · proposal-outline-generator.zip · 11 files
A redacted example of what this tool produces — so you can judge the quality before you buy.
Redacted, illustrative example. Names, agencies, and figures are fictional placeholders.
All upstream inputs present. Full chain active. Tool #36 compliance matrix pasted — REQ IDs flowed into AO leaf nodes. Tool #8 win themes pasted — theme markers injected at 5 canonical points.
Page Limit: 40 pages (per L.3.1.1) | Allocated: 40/40 pages
L Ref: L.3.2.1 | M Link: M.1 | REQ IDs: L3-001, L3-002 Pages: 3 | Writer: TBD | Backup: TBD [THEME] Theme 1 — Proven 99.9% availability (Shipley 4-line — full 3-box structure in Exec Summary) [GRAPHIC] G-1.1: Win-theme 4-box (action caption seed: "The warning gets through.") Content Guidance:
L Ref: L.3.3 | M Link: M.1.1 | REQ IDs: L3-009 Pages: 18 | Writer: TBD | Backup: TBD [THEME] Theme 2 — Sub-five-second latency (section theme, M-factor: M.1.2)
Delivery · Download
Download the zip, unzip it into your Claude skills folder, and invoke it by name. The bundled README includes a one-line verification step to confirm it loaded.
Runs on your existing Claude subscription — no extra setup.
HIGH-TRUST discipline. Where this tool produces pricing, compliance, or past-performance artifacts, FAR/DFARS guardrails and "FOR INTERNAL ESTIMATE USE — NOT A PROPOSAL PRICE" disclaimers are embedded in the output. It does not replace a qualified pricer, counsel, or color-team review.
Sign in to acquire
Runs on your Claude subscription · 30-day money-back guarantee
Paste Section L and Section M of a federal RFP.
Autonomously simulate Shipley Phase 7 color-team reviews (Pink ~30% / Red ~70% mock-SSEB / Gold ~95% exec sponsor)…
L Ref: L.3.3.1 | M Link: M.1.1 | REQ IDs: C5-011 Pages: 8 | Writer: TBD | Backup: TBD [THEME] Theme 1 — Proven 99.9% availability (sub-section theme) [DISCRIMINATOR] D-1: Dual-region ingest with zero Severity-1 product loss in production [GRAPHIC] G-2.1: Failover architecture diagram (action caption seed: "Redundant by design.") Content Guidance:
L Ref: L.3.3.2 | M Link: M.1.2 | REQ IDs: C5-018 Pages: 6 | Writer: TBD | Backup: TBD [GRAPHIC] G-2.2: Latency benchmark chart Content Guidance:
L Ref: L.3.3.5 | M Link: — | REQ IDs: TBD Pages: 4 | Writer: TBD | Backup: TBD Content Guidance:
L Ref: L.3.4 | M Link: M.2.1 | REQ IDs: L4-002 Pages: 7 | Writer: TBD | Backup: TBD [THEME] Theme 3 — Zero-gap 60-day transition (section theme)
Page Limit: 30 pages (per L.4.1) | Allocated: 30/30 pages
L Ref: L.4.1 | M Link: M.2.2 | REQ IDs: M2-004 Pages: 4 | Writer: TBD | Backup: TBD [THEME] Theme 4 — Relevant federal weather/environmental record (section theme, M-factor: M.2) Content Guidance:
L Ref: L.4.2 | M Link: M.2.2 | REQ IDs: TBD Pages: 8 | Writer: TBD | Backup: TBD [GRAPHIC] G-PP1: Relevance crosswalk to current pursuit Content Guidance:
(Section L requires 3 PP references → 3 PP Reference nodes V2-S2, V2-S3, V2-S4.)
Page Limit: No cap | Per agency-specific cost template; pricing volume out of scope for this skill.
L Ref: L.5.1 | M Link: — | REQ IDs: TBD Pages: N/A | Writer: TBD | Backup: TBD Content Guidance:
V{volume#}-S{section#}.{subsection#} (e.g., V1-S2.1).| Section ID | Heading | Owner | Backup | Color-Team Reviewer | Pages | First Draft Due | Pink Due | Red Due | Gold Due | Linked REQ IDs | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|
| V1-S1 | Executive Summary | TBD | TBD | TBD | 3 | 2026-06-22 | 2026-06-29 | 2026-07-13 | 2026-07-27 | L3-001, L3-002 | Open |
| V1-S2.1 | Availability and Failover | TBD | TBD | TBD | 8 | 2026-06-22 | 2026-06-29 | 2026-07-13 | 2026-07-27 | C5-011 | Open |
| V1-S2.2 | Data Quality and Latency | TBD | TBD | TBD | 6 | 2026-06-22 | 2026-06-29 | 2026-07-13 | 2026-07-27 | C5-018 | Open |
| V2-S2 | PP Reference 1 | TBD | TBD | TBD | 8 | 2026-06-22 | 2026-06-29 | 2026-07-13 | 2026-07-27 | — | Open |
(Color-team dates back-calculated from response_deadline 2026-08-03: Gold = deadline − 7; Red = Gold − 14; Pink = Red − 14; First Draft = Pink − 7; Kickoff = First Draft − 14.)
| Volume | RFP Cap | Allocated | Notes |
|---|---|---|---|
| Vol I — Technical | 40 | 40 | Within cap |
| Vol II — Past Performance | 30 | 30 | Within cap |
| Vol III — Cost | No cap | N/A | Agency cost template |
| Vol IV — Contract Docs | 10 | 8 | 2 pages headroom |
RECONCILIATION: PASS
HIGH-TRUST DISCLAIMER
---------------------
This outline is a draft based on pasted Section L instructions. Verify
against the source RFP before kickoff. Proposal manager and writers are
responsible for final outline accuracy. No FOUO/CUI/classified content
accepted in intake.